
Winter's done. The car park has had months of rain sitting in it. The bin truck has done its weekly three-point turn in the same spot. Now there's a patch near the loading dock that looks like someone has taken a rake to it.
So, why is your asphalt crumbling? Most of the time the answer is ravelling. But ravelling is only one of five defects that tend to show up after a wet Australian winter, and they don't all mean the same thing. Some are surface problems with a fairly cheap fix. Others mean the pavement underneath has given up, and no sealant will save it.
This guide covers each defect: what it looks like, what usually causes it, whether it needs a surface or structural fix, and how quickly you need to act. Take it on your post-winter walk-around before you call anyone for a quote. You'll ask better questions, and you'll know when a quote doesn't match the problem.
A quick word on Australian winters. Most asphalt advice online is written for North America, where freezing and thawing tears roads apart. Outside alpine and high-country areas, that isn't really our problem. Our problem is water. Weeks of rain soak through cracks into the base layer, the base goes soft, and the next heavy vehicle finishes the job. Then summer bakes the bitumen brittle and the cycle starts again.
Is the problem in the surface, or in the structure underneath?
A typical car park or access road is a thin layer of asphalt on a compacted crushed rock base, which sits on natural ground. The asphalt keeps water out and takes the scuffing. The base carries the load.
If only the surface is failing, you can treat or replace the surface. If the base is failing, anything you put on top is a bandaid. This is where most maintenance money gets wasted. The classic example is an overlay laid over crocodile cracking, and then the same crack pattern working its way back up through the new asphalt.
What it looks like. The surface turns rough, like coarse sandpaper. The fine material wears away first, then the larger stones start popping out. You'll find loose stones collecting along kerbs, in drain pits and at the bottom of slopes. It's usually worst in wheel paths, turning areas and anywhere water sits after rain.
Likely cause. Ravelling is the binder losing its grip on the stone. In Australia the biggest driver is age and sun. Years of UV and heat oxidise the bitumen until it goes hard and brittle and stops holding the aggregate. Other common causes:
If a fairly new surface is ravelling, suspect construction quality before age.
Surface or structural fix. Usually surface. Early ravelling on a sound pavement can be treated with a rejuvenating or enrichment seal, which puts some life back into the binder. Moderate ravelling is better handled with a new thin surface, such as micro-surfacing, or a mill and resurface. It only becomes a structural job once ravelling has worn through to the base and water is getting in.
Urgency. Moderate, but this is the one to catch early because it's cheapest at the start. Loose stones are a slip risk for pedestrians and get flicked up by tyres. Left alone, ravelled patches open into potholes, especially after a wet winter.
What it looks like. Long depressions running along the wheel paths, like tram lines. They're easiest to spot just after rain, because they hold water.
Likely cause. There are two types, and telling them apart matters.
Mix rutting happens in the asphalt itself. The mix was too soft for the loads, and slow, heavy vehicles in hot weather pushed it sideways. The tell-tale sign is a narrow rut with small humps squeezed up along its edges. Check bus stops, loading docks, boom gates and the bin truck's route.
Structural rutting happens deeper down. The base or the ground beneath it has compressed or gone soft, usually because water got in. These ruts tend to be wider and dish-shaped, without the humps along the sides.
Surface or structural fix. Mix rutting can often be fixed by milling out the rutted layer and replacing it with a mix designed for the actual traffic. Structural rutting needs the failed base dug out and rebuilt, with the drainage fixed. If the drainage isn't fixed, the rutting will come back.
Urgency. It depends on depth and location. Shallow ruts in a staff car park can wait for planned works. Ruts that hold water on a road or a busy pedestrian route are a safety issue now. Standing water also keeps soaking the pavement, so the damage speeds up.
What it looks like. Waves, ripples or bulges in the surface, sometimes with crescent-shaped cracks. It appears where vehicles brake, accelerate or turn hard: entries, boom gates, roundabouts, drive-through lanes, bus bays and loading dock aprons.
Likely cause. The asphalt is being pushed along by forces it can't resist. The usual causes are:
Thin overlays on smooth old surfaces are especially prone to it.
A look-alike to watch for: tree roots. A big gum or fig near the pavement edge can lift the asphalt into a hump that looks like shoving. Root heave needs a different fix. Get arborist advice and check whether council approval is needed before touching the roots, then resurface.
Surface or structural fix. Milling small humps flat is a short-term fix. The proper fix is to remove the area and relay it with a stable mix and a correct tack coat. In spots that take constant heavy braking and turning, like bus bays and loading docks, a reinforced concrete pad is often the better long-term answer.
Urgency. Moderate. Shoving rarely stabilises and usually grows each summer when the asphalt softens. Treat it as high priority if it's on a pedestrian crossing or near an accessible parking bay, where a raised edge becomes a trip hazard.
What it looks like. Smooth, shiny black areas where the stone texture has disappeared under a film of bitumen. On a hot day it goes sticky, picks up tyre marks and gets tracked into foyers on people's shoes. When wet it can be slippery.
Likely cause. There's too much binder for the space in the mix. That can come from:
Heat brings the excess to the surface, which is why bleeding is mostly a summer complaint.
The post-winter catch. You probably won't see sticky bleeding in spring. What you can see is smooth, glossy patches with no texture. Mark them on your site plan now, because those are the spots that will cause trouble on the first 35-degree day.
Surface or structural fix. Surface. In summer, contractors commonly spread grit or sand to blot the excess binder, but that's a stopgap. The permanent fix is to mill off the affected layer and replace it with a correctly designed mix.
Urgency. Low to moderate in a quiet car park. High on any road or ramp where vehicles need grip, because lost texture means lost skid resistance.
What it looks like. A network of connected cracks forming small, many-sided blocks. It looks like crocodile skin, which is why most people here call it crocodile cracking. It starts in the wheel paths and spreads. In the late stage, the blocks rock under traffic and you'll see fine material pumping up through the cracks after rain.
Likely cause. The pavement isn't strong enough for the loads it carries. Every heavy vehicle flexes the asphalt slightly, and after enough passes it fatigues and cracks. Common triggers are:
Surface or structural fix. Structural, every time. Crack sealing can slow water getting in and buy some time, which is worth doing if the full repair is budgeted for next year. But an overlay on crocodile cracking is money down the drain, because the cracks reflect straight back through. The real fix is a full-depth repair:
Urgency. High. Once the cracks connect, water has a direct path into the base, and after a wet winter that's exactly where potholes come from.
If you've found more than one problem, work in this order:
Anything that's a hazard today: potholes, raised edges on pedestrian routes, and ruts holding water on roads.
Crocodile cracking, because every rain event makes the eventual repair bigger.
Structural rutting and ravelling in drainage low spots.
Mix rutting, bleeding and early ravelling, which can usually be bundled into planned works.
Take dated photos of the same spots every year. A photo log turns "it looks worse" into evidence. That helps with budget approvals, strata meetings and any liability question later.
Councils already work from defect hierarchies and intervention levels. In Victoria, councils set inspection frequencies, intervention levels and response times in a Road Management Plan under the Road Management Act 2004, and review it every four years after a council election. The value of this guide for councils is in the treatment decision. Patching a pothole within the response time is compliance. Knowing whether that pothole came from surface ravelling or from crocodile cracking underneath tells you whether you'll be back at the same spot next winter.
Ravelling in the first couple of years usually points to construction. The asphalt may have been laid in cold or wet weather, under-compacted, laid too thin, or the wrong mix for the traffic. Ask the contractor for compaction records and mix details, and check your warranty. AS 2150 is the Australian Standard guide to good asphalt practice, and a reputable contractor will be comfortable discussing it.
Seals and rejuvenators work on surface problems: early ravelling and fine cracking on a sound pavement. On crocodile cracking or structural rutting, it's like painting over rust. Be wary of any quote that offers one treatment for every defect on the site.
Often the property owner. In many council areas, the owner is responsible for the vehicle crossover even though it sits in the road reserve. Policies vary, and most councils require a permit for crossover works, so check with yours before booking anything.
That's a question for your lawyer or insurer, and the answer depends on your state and circumstances. What helps in almost every case is a documented inspection, a repair plan and evidence that you acted on it.
For a whole car park, rarely. Asphalt is usually cheaper upfront and easier to patch. For loading docks, bin enclosures, bus bays and anywhere trucks turn on the spot, concrete is often worth it. Mixing the two is common and sensible.
GOOD Based on 11 reviews Posted on Philippa SommerTrustindex verifies that the original source of the review is Google. Mike and his team did an excellent job on my driveway. Trouble free and smooth transaction. Fast reliable and friendly crew. Very professional and l’m very pleased.Posted on Annie StuartTrustindex verifies that the original source of the review is Google. Cannot praise MR Asphalt enough! Our new driveway is just gorgeous and the whole process from start to finish has been fantastic. Mike's prompt response to our enquiry followed by next day site check by Fraser, whole-team professionalism, courtesy, great communication, amazing workmanship and Kev's meticulous brick art has given us one of the best trade experiences of all time. More than highly recommended as this team is a total stand-out. Thanks again MR and we'll be in touch re our next job soon.Posted on Bronwyn LaphamTrustindex verifies that the original source of the review is Google. I could not be happier with the work of Fraser and Kev. They were polite, friendly, extremely professional and highly skilled with great attention to detail. Excellent communication throughout the process and they delivered as promised. I can't recommend them highly enough.Posted on brendan hamiltonTrustindex verifies that the original source of the review is Google. 10/10, couldn’t recommend enough! Fraser was great to deal with, friendly and the quality of work was top notch I couldn’t have found a better company to do my driveway Thanks Fraser and the guys from Mike Rowley AsphaltPosted on Danny KahTrustindex verifies that the original source of the review is Google. Great job, communicated which days they would be in to take out the old concrete, prepare crushed rock,do the brick edging, and final asphalt. Very happy with the result !!Posted on Harry BastinTrustindex verifies that the original source of the review is Google. Top blokes got everything done on time. Dealt with Fraser, easy process. Really happy with the driveway thanks guys.Posted on Sue CarlinTrustindex verifies that the original source of the review is Google. Great job. Mike and his guys were quick and efficient. Result looks amazing. Reasonably priced and very helpful.Posted on Emily GuyTrustindex verifies that the original source of the review is Google. Excellent work, great attention to detail. My driveway is looking schmick thanks to Mick!